The Span Romance · Chapter 1 of 5

Chapter 1

Nine Months

2 min read

The river Teal came up four metres in a night at the end of August and took the Millside footbridge with it, all eleven metres, and left two stubs of concrete on either bank pointing at each other like people who had stopped speaking.

A hundred and forty children lived on the Millside side. The primary school and the secondary were on the other. The footbridge had been a seven-minute walk. The road bridge at Coldharbour was a forty-minute bus ride, if the bus came.

Dagny Sorensen stood at the front of the parish hall in a county fleece with a laptop that wouldn't connect to the projector and told two hundred people the truth.

“A replacement steel span has to be designed, tendered, fabricated and installed. Realistically, nine months.”

The hall made the noise halls make. A woman near the front said her son had been sick on the bus four days running. Somebody at the back said nine months was the summer holidays again.

“I understand,” Dagny said, which was true and helped nobody.

A man stood up in the third row. Mid-forties, sawdust-coloured hair, a canvas coat with the elbows worn pale. He had big hands and he held them still.

“Rune Halloway,” he said. “I'm a framer. I've got green oak seasoning in my barn and twenty people in this hall who can lift. Give us the abutments as they are and three weeks of low water, and we'll put a timber span back up.”

People started clapping before he had finished. Dagny waited for them to stop.

“A footbridge carrying a hundred and forty children a day is not a barn,” she said. “It needs calculations, certified materials, a load test and a signature. Mine. I'm not putting my name to something built by enthusiasm.”

“Then don't build it by enthusiasm,” he said. “Build it with me.”

The chair of the parish council, a retired dentist with a fondness for decisions, rapped his pen on the table. The county director had already told him by phone, he said, that if a volunteer build could be done to standard, the county would fund materials rather than nine months of buses. The window for working in the river closed in the third week of September, when the autumn rains came.

“Twenty-one days,” he said. “Ms Sorensen supervises. Mr Halloway builds. Shall we vote?”

They voted. Dagny didn't, because she wasn't parish. She went out to her car and sat in it with the door open and the dome light on.

Back at the county office that night she pulled the archive file for the Millside crossing, because she pulled the file for everything. Construction drawings, 2006. Two inspection reports, the second one hers. Ink on tracing paper, beautifully lettered, a timber truss bridge on two concrete abutments with an oak deck.

In the corner of every sheet, in a careful young hand: Designed and built by R. Halloway.

He had built the bridge that fell. And he had stood up in front of the whole village and offered to build it again without mentioning it once.